The VIP section, inside the Hall, have also been getting a lot of attention lately. Most of the framing is done and the old AC ducts have been removed:
And finally today has seen a lot of concrete being poured. The floor for the atrium bar, the floor for the restaurant, and the new Emergency Exit stairs were all poured this morning:
there are some more pics I just loaded in the new October section at the Minglewoodhall picture site